Skip to content
Illustrative image: Gravel access road through the Alberta landscape
Near Fox Creek, Alberta
Complete

Bitdeer: Fox Creek data centre development

The site is positioned to become Canada's largest Bitcoin mining data centre.

Specification

The facts

Capacity
101 MW
Status
Fully permitted
Location
Fox Creek, AB
Counterparty
Bitdeer Technologies Group (NASDAQ: BTDR)
Role
Site identification · evaluation · advisory
Outcome
Positioned to become Canada's largest Bitcoin mining data centre
The situation

What the client faced

A NASDAQ-listed operator needed Alberta capacity at scale and fast, with permitting risk already resolved, but had no local view of which sites could actually be energised.

The market offered a long list of candidates and little reliable information. Gas access, permitting, and interconnection varied enormously between sites that looked identical on paper.

What we did

TwelveSix's role, in sequence

  1. 01

    Screened candidates on deliverability across power, gas access, and permitting standing, not headline capacity.

  2. 02

    Evaluated the shortlisted site in detail: generation configuration, gas supply, interconnection, and regulatory standing.

  3. 03

    Advised through diligence and acquisition alongside the counterparty's team and advisors.

Outcome

The result

  • The acquisition of a 101 MW fully permitted site near Fox Creek.

  • The site is positioned to become Canada's largest Bitcoin mining data centre.

Related

Other engagements

Illustrative image: Electricity transmission lines crossing the Alberta landscape

Pathfinder / MCK SISP

Appointment
Exclusive Sales Agent
Appointed by
GlassRatner Restructuring
Process
Court supervised SISP
Read the case study
Illustrative image: Aerial view of energy processing infrastructure in Alberta
Private

30 MW development

Capacity
30 MW
Work
Site · supply · development · execution
Disclosure
Client and location withheld
Read the case study
Illustrative image: Aerial view of energy processing infrastructure in Alberta
Private

200 MW development

Capacity
200 MW
Work
Site · power · gas · regulatory · commercial · execution
Disclosure
Client and location withheld
Read the case study
Illustrative image: Aerial view of natural gas processing and midstream infrastructure in Alberta
Private

400 MW development

Capacity
400 MW
Work
Site origination · energy · infrastructure · regulatory · commercial · development
Disclosure
Client and location withheld
Read the case study
Illustrative image: Aerial view of natural gas processing and midstream infrastructure in Alberta
Private

Gas egress solution

Challenge
Gas egress · commercial demand
Work
Load matching · supply structure · project pathway
Disclosure
Client and location withheld
Read the case study
Illustrative image: Aerial view of energy processing infrastructure in Alberta
Private

Brownfield infrastructure

Asset
Existing energy and industrial infrastructure
Work
Site evaluation · supply pathway · development planning
Disclosure
Client and location withheld
Read the case study
Illustrative image: Electricity transmission lines crossing the Alberta landscape
Private

Power developments

Assets
Multiple power and compute development opportunities
Work
Site development · gas and power strategy · regulatory · infrastructure · commercial structuring · execution planning
Disclosure
Client and locations withheld
Read the case study
Illustrative image: Gravel access road through the Alberta landscape
Private

Energy asset sale

Process
Positioning · outreach · diligence · negotiation
Buyer set
Strategic and financial counterparties
Disclosure
Client, assets, and location withheld
Read the case study
Illustrative image: Electricity transmission lines crossing the Alberta landscape
Active mandate

Camrose site sale

Location
Camrose, Alberta
Mandate
Technical agent
Work
Asset review · technical diligence · buyer engagement · transaction support
Read the case study
Next step

Coming to Alberta for compute?

If Alberta is part of the plan, we'll help you understand the opportunity and the path forward.